Program Outline
| A |
Animal Barn |
1 |
32 |
40 |
1280 |
sf |
| A1 |
Paddock |
1 |
24 |
32 |
768 |
sf |
| A2 |
Paddock |
1 |
24 |
24 |
576 |
sf |
| B |
Vet Support |
1 |
32 |
16 |
512 |
sf |
| B1 |
Isolation Paddock |
1 |
36 |
24 |
864 |
sf |
| C |
Sheds |
|
|
|
|
|
| C1 |
Entry Wash Station |
1 |
20 |
30 |
600 |
sf |
| C2 |
Exit Wash Station |
1 |
15 |
30 |
450 |
sf |
| C3 |
Feeding Station |
1 |
15 |
30 |
450 |
sf |
| C4 |
Demonstration
Area |
1 |
15 |
30 |
450 |
sf |
| C5 |
Climbing Station |
1 |
15 |
30 |
450 |
sf |
| D |
Contact Yard |
1 |
|
|
6900 |
sf |
| |
Entry Yard |
1 |
30 |
40 |
1200 |
sf |
| |
Front Yard |
1 |
40 |
80 |
3200 |
sf |
| |
Exit Yard |
1 |
50 |
50 |
2500 |
sf |
| |
|
|
|
|
|
|
| |
Moved or Existing
Structures |
|
|
|
|
|
| 1 |
Administrative |
1 |
20 |
14 |
280 |
sf |
| 2 |
Reptile Homestead |
1 |
30 |
30 |
900 |
sf |
| 3 |
Chicken Coop
Entry |
1 |
12 |
20 |
240 |
sf |
| 4 |
Hay Barn |
1 |
12 |
12 |
144 |
sf |
| |
|
|
|
|
|
|
| |
Off-site Development |
|
|
|
|
|
| E |
Quarantine |
1 |
32 |
32 |
1024 |
sf |
| E1 |
Paddock |
1 |
40 |
24 |
960 |
sf |
| E2 |
Hay Barn |
1 |
20 |
24 |
480 |
sf |
Last Updated on 11/22/00
By Nevin Lash
Outline Specification:
ANIMAL SUPPORT BARN
Structure
Spread footings
Slab on grade, no basement-
center trench drain, broom finished concrete with epoxy coating.
Heavy Timber Structure
Exposed roof structure,
no insulation
Interior columns set on
concrete piers (8î high)
Loading dock (2í high)
Exterior facade
Wood (2îx6î) stud walls
with 3/4î plywood (board & batten) sheathing
(2) 8íx8í exterior sliding
doors - 2îx6î plank construction, front and back
(6) 4íx8í exterior sliding
doors - 2îx6î plank construction, at stall
Roof
Cedar shake roof, no insulation
Interior Finishes
Sealed wood
(6) 4íx8í interior sliding
doors - 2îx6î plank construction, at stall front/between stalls
Stall partitions to be of
treated 2x6 lumber stacked in a metal channel to the structural beam overhead
Partitions above overhead
structural beam level with wire mesh to roof deck.
Food prep to have 3-part
ss sink with countertops and shelving.
Plumbing
Sink at food prep stall
(2) hose bibs in keeper
aisle, insulted piping
(2) exterior hose bibs,
insulted piping
Prefabricated trench drain
system with basket catch basin
HVAC
42î exhaust fan and relief
grill
two overhead mounted gas
fired fan driven unit heaters (55°)
Electrical
(3), 110 V covered GFI receptacles
at food prep
(4), 110 V covered GFI receptacles
at keeper aisle
(2), 110 V covered GFI receptacles
at exterior
(1) 1x4 covered fluorescent
light fixture, each stall
(4) 1x4 covered fluorescent
light fixture, in center stall
(1) phone connection in
food prep stall
Outline Specification:
ISOLATION BARN
Structure
Spread footings
Slab on grade, no basement-
center trench drain
broom finished concrete
with epoxy coating.
Heavy Timber Structure
Prefab truss roof system
with insulation
Interior columns set on
concrete piers (8î high)
Optional lower level shed
(2í below main floor)
Exterior facade
Wood (2îx6î) stud walls,
3/4î plywood (board & batten) sheathing
(1) 8íx8í exterior sliding
doors - 2îx6î plank construction, front and back
(2) 4íx8í exterior sliding
doors - 2îx6î plank construction, at stall
Roof
Cedar shake roof or galv.
metal
Cupola with weathervane
Interior Finishes
Sealed wood
(2) 4íx8í interior sliding
doors - 2îx6î plank construction, at stall front/between stalls
Stall partitions to be of
treated 2x6 lumber stacked in a metal channel to the structural beam overhead
Partitions above overhead
structural beam level with wire mesh to underside of truss ceiling.
Provide gypsum board, cleanable
ceiling throughout
Food prep to have 3-part
ss sink with countertops and shelving.
Plumbing
Provide two trench drains,
one each at center isle end of stalls
Sink at food prep stall
(2) hose bibs in keeper
aisle, insulted piping
(2) exterior hose bibs,
insulted piping
Prefabricated trench drain
system with basket catch basin
HVAC
Barn to be heated and cooled
via gas fired split system to maintain 75°
Electrical
(3), 110 V covered GFI receptacles
at food prep
(2), 110 V covered GFI receptacles
at keeper aisle
(1), 110 V covered GFI receptacles
at exterior
(3) 1x4 covered fluorescent
light fixture in stall area
(4) 2x4 covered fluorescent
light fixture, in center stall
(1) phone connection in
food prep stall
Last Updated on 11/20/00
By Nevin Lash |